Concrete Takeoff Kit • Construction Takeoff & Bidding Spreadsheets

Concrete Contractor Flatwork & Footing Bid Master Sheet

Automated cubic yardage calculator for slabs, thickened-edge monolithic footings, rebar grid spacing, gravel subbase tonnage, and 50-state ready-mix concrete cost benchmarks.

What's Included in This Multi-Tab Workbook

Compatible with Microsoft Excel (.xls/.xlsx), Google Sheets, Apple Numbers, and includes a formatted Printable PDF Compliance Binder View.

  • Tab 1: Slab & Footing Takeoff (9 pre-built rows) Included
  • Tab 2: Pour Day Quality Log (5 pre-built rows) Included
  • Tab 3: 50-State Concrete & Frost Table (50 pre-built rows) Included
  • 50-State 2026 Rate & Statutory Lookup Table Included
  • Print-Ready Client / Compliance Binder View Included
Instant Digital Download
$19 One-Time (Zero Monthly Fees)
Includes 3 pre-built tabs + 50-state lookup data

Save 15+ hours of spreadsheet engineering. Every row below is pre-populated so you can plug in your numbers or print the compliance checklist immediately.

← Back to Free Interactive 50-State Calculator

Interactive Workbook Tab Preview & Printable Binder Sheets

Tab 1: Slab & Footing Takeoff

Component / Cost ItemQuantityUnitUnit Price ($)Total Cost ($)Engineering / Field Spec
Main Slab Concrete (24'x24' @ 4" + 10% waste)7.82Cubic Yards1681313.764,000 PSI w/ 6% air entrainment + fiber mesh
Perimeter Turndown Footing (96 lin ft @ 12"x12")3.91Cubic Yards168656.88Monolithic thickened edge below frost line
Compacted Crushed Stone Base (4" depth)11.5Tons343913/4" minus crushed limestone compacted to 95%
Under-Slab Vapor Retarder (15-Mil Class A)650Sq Ft0.28182Lapped 6" at seams and taped with moisture tape
#4 Rebar Grid (18" OC Both Ways + Chairs)820Linear Ft0.85697Grade 60 #4 deformed bar on 2" dobies/chairs
Form Lumber, Stakes, Release Oil & Expansion Joint96Linear Ft2.4230.42x6 perimeter forms + 1/2" asphalt expansion strip
Excavation, Forming, Pour & Power Trowel Labor32Crew Hours8828164-man flatwork crew (prep day + pour/sawcut day)
Acrylic Curing & Sealing Compound (2 coats)25-Gal Pails115230ASTM C309 cure-and-seal applied after finishing
TOTAL CONCRETE FLATWORK BID576Sq Ft11.316517.04Complete turnkey slab & footing estimate

Tab 2: Pour Day Quality Log

Quality Control CheckTarget SpecificationRecorded ValueTime CheckedForeman Initials
Subgrade Compaction & Proof RollFirm, uniform, zero rutting or standing waterVerified07:00 AMJM
Vapor Barrier & Rebar Chair ClearanceRebar centered in slab; 2" clear coverVerified07:30 AMJM
Ready-Mix Batch Ticket Verification4,000 PSI, max 0.45 w/c ratio, 4"–5" slump4.5" Slump08:15 AMJM
Bull Float & Bleed Water Wait PeriodDo not steel trowel while bleed water is presentVerified10:30 AMJM
Control Joint Sawcutting (1/4 Slab Depth)Cut within 4–12 hours @ max 10'x10' panelsCut @ 1.25"03:00 PMJM

Tab 3: 50-State Concrete & Frost Table

StateAbbr4,000 PSI Ready-Mix ($/yd³)Frost Line Depth (Inches)Avg Labor Rate ($/hr)Local Engineering Note
AlabamaAL1481268High summer humidity requires moisture-mitigating epoxy primer on unsealed slabs.
AlaskaAK21560112Extreme freeze-thaw cycles require air-entrained concrete (6%+) and deep perimeter footings.
ArizonaAZ1621282Intense UV exposure demands UV-stable polyaspartic topcoats to prevent ambering.
ArkansasAR1451865Moderate winters and humid summers favor early-morning concrete pours and mildew-resistant exterior washes.
CaliforniaCA19812118Strict AQMD low-VOC coating regulations (<50 g/L) and AB 12 1-month security deposit caps apply statewide.
ColoradoCO1753692High altitude UV and rapid freeze-thaw swings require 4,000+ PSI concrete and polyaspartic sealers.
ConnecticutCT18542104Road de-icing salts require chemical-resistant urethane or polyaspartic garage topcoats.
DelawareDE1683088Coastal humidity and high water tables require vapor barrier verification before slab coating.
FloridaFL165680High hydrostatic vapor pressure in slabs requires 100%-solids moisture-vapor-barrier epoxy primer.
GeorgiaGA1581278Red clay soil expansion and heavy organic pollen/algae growth drive high exterior soft-wash frequency.
HawaiiHI2400124Marine salt air corrosion and freight surcharges significantly increase material landed costs.
IdahoID1623679Cold winter ground temperatures require cold-cure polyaspartic formulas for winter installations.
IllinoisIL1784298Strict municipal landlord ordinances (Chicago RLTO) and heavy winter road salt protection required.
IndianaIN1563677Freeze-thaw concrete spalling protection makes penetrating silane-siloxane sealers high ROI.
IowaIA1544875Deep 48-inch frost lines require reinforced perimeter footings and air-entrained mixes.

Showing first 15 of 50 rows. Download the full .XLS workbook to view all 50 rows.